Little gender equality in the 1970sStorting confirms Statoil’s holding

Construction of Statfjord A

text_format
The construction of Statfjord A included two major industrial assignments: construction of a concrete substructure and a topside so complicated that no one had done anything like it before.
By Trude Meland, Norwegian Petroleum Museum
- Construction of the Statfjord A topsides at Stord Verft. Photo: Aker/Norwegian Petroleum Museum

The casting the GBS for Statfjord A took place at Norwegian Contractors in Hinnavågen.

While the topside was being built at Aker Stord Verft.

Footnotes

    close Close

    Leave a Reply

    Your email address will not be published. Required fields are marked *